Start Date:
05/2/08

End Date:
06/6/08

Exits 1 & 2

EXIT 1:

There will be daily I-93 northbound slow speed shoulder closures to facilitate trucking operations. Also anticipate daily lane closures on the SB on-ramp. These closures will have only minimal impacts to traffic. The SB ramp traffic will be shifted to make room for construction of the new bridges. Ramp traffic will be maintained on 11-foot lanes separated by Jersey barrier.

EXIT 2:

Work on South Policy Street will require lanes to be shifted with alternating one-lane, two-way traffic possible.